What can we do for constructors

using lean and last planner in the construction phase:

  • will usually reduce the construction phase by around 20%
  • ensures that the construction team arrive on site prepared to do the work and ready to work together
  • gets the team to sort many issues out before they arrive on site
  • enables the team to re-plan more quickly when they encounter the unexpected

using lean in design and construction with early constructor involvement:

  • as above plus:
  • allows the constructor to be clear about what drawings are needed from the designers
  • allows the design and construction team to work together to maximise end-user value with safer, greener, easier, cheaper, faster construction method
  • compresses the design and construction period often by 30% or more