What can we do for constructors
using lean and last planner in the construction phase:
- will usually reduce the construction phase by around 20%
- ensures that the construction team arrive on site prepared to do the work and ready to work together
- gets the team to sort many issues out before they arrive on site
- enables the team to re-plan more quickly when they encounter the unexpected
using lean in design and construction with early constructor involvement:
- as above plus:
- allows the constructor to be clear about what drawings are needed from the designers
- allows the design and construction team to work together to maximise end-user value with safer, greener, easier, cheaper, faster construction method
- compresses the design and construction period often by 30% or more