benefits for constructors

using lean and last planner in the construction phase:

  1. Bulletwill usually reduce the construction phase by around 20%

  2. Bulletensures that the construction team arrive on site prepared to do the work and ready to work together

  3. Bulletgets the team to sort many issues out before they arrive on site

  4. Bulletenables the team to re-plan more quickly when they encounter the unexpected 

using lean in design and construction with early constructor involvement:

  1. Bulletas above plus:

  2. Bulletallows the constructor to be clear about what drawings are needed from the designers

  3. Bulletallows the design and construction team to work together to maximise end-user value with safer, greener, easier, cheaper, faster construction method

  4. Bulletcompresses the design and construction period often by 30% or more