benefits for constructors
using lean and last planner in the construction phase:
will usually reduce the construction phase by around 20%
ensures that the construction team arrive on site prepared to do the work and ready to work together
gets the team to sort many issues out before they arrive on site
enables the team to re-plan more quickly when they encounter the unexpected
using lean in design and construction with early constructor involvement:
as above plus:
allows the constructor to be clear about what drawings are needed from the designers
allows the design and construction team to work together to maximise end-user value with safer, greener, easier, cheaper, faster construction method
compresses the design and construction period often by 30% or more
Constructors can benefit from:
and if involved from the outset:
We use lean & systems thinking and lean construction principles and insights.
We offer consultancy, experiential workshops (using a range of games & simulations) and study tours.