To make significant improvements in the end-to-end construction process it is vital to begin working with the design and construction team right at the start of the design stage. While it is tempting in the current downturn to go back to single stage tendering being a cowboy client isn’t a good long-term strategy.
Collaboration from the very start enables the whole team to focus on delivering what the client/owner wants in the easiest possible way.
Designers are not constructors. That is why it is important to involve constructors during the design process so that the production system design emerges alongside the product design so as to optimise buildability, design, cost and value.
For information on all these topics and more please call:
Relational contracting
business case development
target value design, set based design & design structure matrices
Last Planner® System, Learning-led Design Delivery System™ & Responsibility-based Project Delivery™
integrating all the design disciplines - and that includes constructors!
planning design delivery processes
Collaboratively Planning the design of a 4,500m2 building